unhallowed wizardry
It’s still National Creme Brulee Day, in these United States.
– photo by Mitch Waxman
We’re breaking with normal Newtown Pentacle tradition today, and there will be multiple posts coming your way, devoted to the seismic events on Newtown Creek which saw the central truss of the Kosciuszko Bridge first lowered and then carted away over the last couple of days. This second post carries some proper shots of the lowering action. In this morning’s post, a time lapse video of the lowering of the Kosciuszcko Bridge’s central truss was offered. What follows will be everything else I shot, basically all the stills.
There’s a third post that’ll be coming your way tonight, btw., so keep an eye on this – your Newtown Pentacle.
– photo by Mitch Waxman
One had arrived at the Meeker Avenue street end, aka Penny Bridge, by about ten in the morning. Not too much was happening, and word reached me that the lowering process – originally scheduled to begin at ten, would be delayed several hours due to an engineering issue which needed to be solved.
– photo by Mitch Waxman
There were several tugs buzzing about.
– photo by Mitch Waxman
Above, you can see the two flat top barges which were married together by a steel superstructure which would accept and support the bridge section.
The truss itself was no longer supported, structurally speaking, by the approaches or towers which had cradled it for the last seventy eight years. Instead, it was the four “strand jacks” which were holding it up. Those yellow bits were the shoes on which the truss’s girders sat.
FDNY and NYPD harbor units were on scene, with different units arriving and departing all day.
– photo by Mitch Waxman
The barges were continuously maneuvered, throughout the day.
– photo by Mitch Waxman
About two in the afternoon, the truss began to lower. It was moving so slowly, about twenty feet per hour I’m told, that to the eye it appeared entirely static.
– photo by Mitch Waxman
I was using two cameras, if you’re wondering. One was on a tripod, the other handheld.
– photo by Mitch Waxman
As the burning thermonuclear eye of God itself dipped behind Manhattan, and the Newtown Creek grew dark, the crews were still lowering the truss. The garish lights of the new bridge activated.
– photo by Mitch Waxman
There was quite a crowd gathered all around the Newtown Creek, and especially so at the Penny Bridge site where I was.
– photo by Mitch Waxman
By about 9:30 or so, the truss was almost resting on the barge.
– photo by Mitch Waxman
A groaning sound of buckling steel echoed out across the Creek as the weight of the truss was suddenly taken up by the superstructure on the barges.
– photo by Mitch Waxman
One spent about twelve hours at Penny Bridge, or the Meeker Avenue Street End, on the 25th of July in 2017. I would have to come back to Newtown Creek the next day, of course, to get shots of the thing leaving. That’s tonight’s post, however, as I’m still finishing up the shots for that one as you’re reading this.
Documenting this project has been a long standing project of mine – this 2012 post tells you everything you could want to know about Robert Moses, Fiorella LaGuardia, and the origins of the 1939 model Kosciuszko Bridge. Just before construction started, I swept through both the Brooklyn and Queens sides of Newtown Creek in the area I call “DUKBO” – Down Under the Kosciuszko Bridge Onramp. Here’s a 2014 post, and another, showing what things used to look like on the Brooklyn side, and one dating back to 2010, and from 2012 discussing the Queens side – this. Construction started, and this 2014 post offers a look at things. There’s shots from the water of Newtown Creek, in this June 2015 post, and in this September 2015 post, which shows the bridge support towers rising. Additionally, this post from March of 2016 detailed the action on the Queens side. Most recently, here’s one from May of 2016, and one from June of the same year. Here’s one from August of 2016, the December 2016 one, one from March of 2017 which discusses the demolition of the 1939 bridge.
Most recently – a post showing what I saw during a pre opening walk through in early April of 2017, and the fanfare surrounding the opening of half of the new bridge in April of 2017, and a walk through of the Brooklyn side job site in June of 2017. Lastly, here’s some night shots from early July of 2017.
Upcoming Tours and events
The Insalubrious Valley of the Newtown Creek Walking Tour, with Newtown Creek Alliance – Saturday August 5th, 11 a.m. – 1;30 p.m.
Century old movable bridges, the remains of a 19th century highway between Brooklyn and Queens, and explore two of the lesser known tributaries of the troubled Newtown Creek watershed. For the vulgarly curious, Conrad Wissell’s Dead Animal and Night Soil wharf will be seen and described, with NCA Historian Mitch Waxman – details here.
Brooklyn Waterfront Boat Tour, with Working Harbor Committee – Saturday August 12th, 6 p.m. – 8 p.m.
Explore the coastline of Brooklyn from Newtown Creek to Sunset Park, with NCA Historian Mitch Waxman, Andrew Gustafson of Turnstile Tours, and Gordon Cooper of Working Harbor Committee on the narrating about Brooklyn’s industrial past and rapidly changing present. – details here.
The Poison Cauldron of the Newtown Creek Walking Tour, with Newtown Creek Alliance – Sunday August 13th, 11 a.m. – 1:30 p.m.
Explore the hellish waste transfer and petroleum districts of North Brooklyn on this daring walk towards the doomed Kosciuszko Bridge, with NCA Historian Mitch Waxman – details here.
Two Newtown Creek Boat Tours, with Newtown Creek Alliance and Open House NY – Wednesday August 16th, 5 p.m. and 7 p.m.
The neighborhoods surrounding Newtown Creek are home to the densest collection of these garbage facilities anywhere in the city and collectively, the waste transfer stations around and along Newtown Creek handle almost 40% of the waste that moves through New York. Join Newtown Creek Alliance’s Mitch Waxman and Willis Elkins to learn about the ongoing efforts to address the environmental burden that this “clustering” has caused. – details here.
“follow” me on Twitter- @newtownpentacle
[…] a time lapse video of the lowering of the Kosciuszcko Bridge’s central truss was offered. This afternoon’s carried everything else I […]
eleventh hour | The Newtown Pentacle
July 27, 2017 at 8:05 pm
[…] on the removal of the central truss of the 1939 bridge from the summer of 2017 – a timelapse, some stills, and the barging out of the […]
shrewd questioning | The Newtown Pentacle
September 21, 2017 at 11:01 am
[…] on the removal of the central truss of the 1939 bridge from the summer of 2017 – a timelapse, some stills, and the barging out of the […]
local inquisitiveness | The Newtown Pentacle
October 5, 2017 at 11:03 am
[…] on the removal of the central truss of the 1939 bridge from the summer of 2017 – a timelapse, some stills, and the barging out of the […]
familiar rookery | The Newtown Pentacle
December 1, 2017 at 11:01 am
[…] on the removal of the central truss of the 1939 bridge from the summer of 2017 – a timelapse, some stills, and the barging out of the […]
neighboring alcove | The Newtown Pentacle
June 12, 2018 at 11:01 am
[…] on the removal of the central truss of the 1939 bridge from the summer of 2017 – a timelapse, some stills, and the barging out of the […]
hoarsely explained | The Newtown Pentacle
February 6, 2019 at 12:16 pm
[…] on the removal of the central truss of the 1939 bridge from the summer of 2017 – a timelapse, some stills, and the barging out of the […]
palpably unfinished | The Newtown Pentacle
August 7, 2019 at 11:01 am
[…] on the removal of the central truss of the 1939 bridge from the summer of 2017 – a timelapse, some stills, and the barging out of the […]
mysterious archways | The Newtown Pentacle
August 30, 2019 at 11:06 am