tireless and continuing
“follow” me on Twitter at @newtownpentacle
– photo by Mitch Waxman
Missives regarding the Newtown Creek reach my desk all the time, mostly describing activist causes and far reaching governmental plans, but a particular message from the United States Coast Guard seemed to be the sort of thing which will likely affect the communities (on both sides and upon the water) which are nearby the troubled waterway so I decided to share it with you.
The Greenpoint Avenue Bridge is going to receiving attention, this summer, from NYC DOT bridge painting crews.
from federalregister.gov
The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Greenpoint Avenue Bridge across Newtown Creek, mile 1.3, at New York City, New York. The deviation is necessary to facilitate bridge painting operations. Under this temporary deviation, the bridge may remain in the closed position for various times up to six days at a time during a four month period.
– photo by Mitch Waxman
From the sound of it, the main inconvenience will be felt by the maritime community, as the bridge repair will render the drawbridge static for as long as six days at a pop between May and September.
For drivers, and this is an incredibly busy span, one suspects that there will be traffic tie ups and lane closures but this is conjecture based solely on the behavioral and occupational patterns exhibited and displayed by DOT crews and their contractors on other projects around the City.
One suspects that the four day windows when the draw bridge is open for “business as usual” shall also witness a higher than normal number of bridge openings, which is good for me, of course as lots and lots of tugboats will be lined up along the Creek.
also from federalregister.gov
The bridge owner, New York City Department of Transportation, requested multiple six day closure periods between May 1, 2013 and September 30, 2013, to facilitate bridge painting operation at the Greenpoint Avenue Bridge. Each six day closure period will be followed with four days of normal bridge operations. The exact time and dates of each six day closure period will be announced in the Local Notice to Mariners and also with a Broadcast Notice to Mariners at least two weeks in advance of each closure period. This temporary deviation will be in effect from May 1, 2013 through September 30, 2013.
– photo by Mitch Waxman
C’est la vie, life in the big city, and what can you do about it anyway?
Such maintenance is a necessary inconvenience to keep the structure from rotting away into a corroded heap. The waters of the Newtown Creek, just like the East River, are brackish. Salt is the natural enemy of steel and no one wishes to see a traffic mess like the one created by the 1987 rebuild of the bridge occur anytime soon.
Additionally, although I imagine that the Public Art Commission will approve the continued usage of “Aluminum Green” paints for the Greenpoint Avenue Bridge, I would suggest that using “Pulaski Red” all the way back to the Metropolitan Avenue Bridge would visually unite and “Brand” the Bridges of Newtown Creek.
from nyc.gov
The first bridge on this site, a drawbridge known as the Blissville, was built in the 1850’s. It was succeeded by three other bridges before a new one was completed in March 1900 at a cost of $58,519. That bridge received extensive repairs after a fire in 1919 damaged parts of the center pier fender, the southerly abutment, and the superstructure. Until that time, the bridge had also carried tracks of the Long Island Rail Road. The current bridge was built in 1987.
Also: Upcoming Tours!
13 Steps around Dutch Kills– Saturday, May 4, 2013
Newtown Creek walking tour with Mitch Waxman and Atlas Obscura, tickets now on sale.
Parks and Petroleum- Sunday, May 12, 2013
Newtown Creek walking tour with Mitch Waxman and Newtown Creek Alliance, tickets now on sale.
The Insalubrious Valley- Saturday, May 25, 2013
Newtown Creek walking tour with Mitch Waxman and Atlas Obscura, tickets on sale soon.
Hidden Harbor: Newtown Creek tour with Mitch Waxman – Sunday, May 26,2013
Boat tour presented by the Working Harbor Committee,
Limited seating available, order advance tickets now. Group rates available.
[…] reporting on the bridge maintenance last month, in the posting “tireless and continuing,” your humble narrator contacted the WHC group’s leader- Captain John Doswell- and the […]
impassable barrier | The Newtown Pentacle
May 14, 2013 at 1:58 am