The Newtown Pentacle

Altissima quaeque flumina minimo sono labi

Posts Tagged ‘DUKBO

mysterious archways

with 2 comments

Kosciuszcko Bridge opening ceremony, in today’s post.

– photo by Mitch Waxman

All the fancy people showed up along my beloved Newtown Creek on Wednesday. Governor Andrew Cuomo’s office had sent out the invitations, and I was lucky enough to receive one. Our Governor really knows how to put on a show, it should be mentioned, and what a show it was. The invitation discussed him “cutting the ribbon” on the deck of the brand new Kosciuszcko Bridge, and along with a few hundred onlookers and a gaggle of media people, that’s just what he did.

For a whole lot of Brooklyn and Queens people, this event signaled the end of a long process, including myself. I’ve been taking pictures of this operation for nearly a decade.

– photo by Mitch Waxman

Documenting this project has been a long standing project of mine – this 2012 post tells you everything you could want to know about Robert Moses, Fiorella LaGuardia, and the origins of the 1939 model Kosciuszcko Bridge.

Just before construction started, I swept through both the Brooklyn and Queens sides of Newtown Creek in the area I call “DUKBO” – Down Under the Kosciuszcko Bridge Onramp. Here’s a 2014 post, and another, showing what things used to look like on the Brooklyn side, and one dating back to 2010, and from 2012 discussing the Queens side – this. Construction started, and this 2014 post offers a look at things.

There’s shots from the water of Newtown Creek, in this June 2015 post, and in this September 2015 post, which shows the bridge support towers rising. Additionally, this post from March of 2016 detailed the action on the Queens side. Most recently, here’s one from May of 2016, and one from June of the same year. Here’s one from August of 2016the December 2016 one, one from March of 2017 which discusses the demolition of the 1939 bridge.

Here’s a post showing what I saw during a pre opening walk through in early April of 2017, and the fanfare surrounding the opening of half of the new bridge in April of 2017, a walk through of the Brooklyn side job site in June of 2017. Here’ssome night shots from early July of 2017. A series of posts focused in on the removal of the central truss of the 1939 bridge from the summer of 2017 – a timelapse, some stills, and the barging out of the truss.

More recently, in late September of 2017, a final series of shots of the old bridge were captured in this post. Acquisition of a souvenir chunk of steel from the 1939 bridge was described in this post, and a video of the “energetic felling” of the approaches on October 1st was offered in this one. Still shots and views of the aftermath from the waters of Newtown Creek from later in the day on Oct. 1 are found in this posting, and the aftermath of the demolition as seen from Calvary Cemetery in LIC’s Blissville section in this post from October 5th. This post from December of 2017 closed out an event filled year in DUKBO, and a visit to the site at night is described in this March of 2018 post. Another progress report was offered in June of 2018. A nocturnal visit occurred in December of 2018, a short post from January of 2019, and also one from February of 2019. Most recently, in August of 2019, I made another night time visit.

– photo by Mitch Waxman

There were speeches from familiar faces – NYS Assemblymembers Cathy Nolan and Joe Lentol spoke. The audience included a series of political “powers that be,” including political bosses like Frank Seddio and Congressman Greg Meeks. Congresswoman Carolyn Maloney was there, as were Council Members Steve Levin and Bob Holden. There were a bunch of politicians there whom I’ve never associated with Newtown Creek in the past, but there you are.

Andrew Cuomo draws a crowd, and he brought his Mom along as well.

– photo by Mitch Waxman

Rain threatened, but the skies held out during the speech making section of the event. Experience has taught me not to sit down during these sort of things, as you get stuck in the chair and all of your photos will end up being from the same point of view. My constant milling about earned some “hairy eyeball” action from the dozens of NYS Troopers and Gubernatorial Security people, but they must’ve figured that a humble narrator was harmless.

Truth be told, I kept on thinking about how I was just standing there on the Brooklyn Queens Expressway.

– photo by Mitch Waxman

If you include planning and funding this project – decades in the making – the various elected officials finally gathered to cut the ceremonial ribbon on the final stage of the K Bridge project. The ceremony ended, although there would be a celebratory cocktail hour later that night, and the crowd began to disperse.

I didn’t take a single picture at the afterparty, btw., having decided that I just wanted to enjoy the moment for once. There was a light show highlighting the new bridge, and Billy Joel was simulcast from a live concert at Madison Square Garden. Mr. Joel mentioned the bridge, his affection for the Governor, and then played his anthemic “New York State of Mind” while the light show was presented.

Luckily, a friend gave me a ride home from Maspeth afterwards, and I didn’t have to walk or spend money on a cab.

– photo by Mitch Waxman

The pedestrian and bicycle section of the Kosciuszcko Bridge is everything which I’ve been hoping it would be, visually speaking. One will be spending a LOT of time up there in the coming weeks as I’ve been hungering for unhurried access to this vantage point for literally years.

One made his way back to Laurel Hill Blvd. and eventually Astoria by walking northwards along it.

– photo by Mitch Waxman

Unfortunately, I did have to hurry, as shortly after the ceremony ended, the clouds did indeed burst and rain began falling.

In actuality, it was more of precipitating mist when the photos above and below were captured. That’s when the clouds are scraping along the roof and tree tops and there aren’t raindrops – per se – but the air is full of droplets.

– photo by Mitch Waxman

Yessiree, I’m going to be inhabiting this walkway for most of September. Can’t wait to do a walk through at night as well.

– photo by Mitch Waxman

Frankly, it’s been a lucky stroke for me that this project has occurred practically in my back yard. Even more so that it crosses my beloved Newtown Creek.

Now… what’s next?


“follow” me on Twitter- @newtownpentacle


Buy a book!

In the Shadows at Newtown Creek,” an 88 page softcover 8.5×11 magazine format photo book by Mitch Waxman, is now on sale at blurb.com for $30.

Written by Mitch Waxman

August 30, 2019 at 11:05 am

palpably unfinished

with 4 comments

DUKBO, Down Under the Kosciuszko Bridge Onramp.

– photo by Mitch Waxman

The other night, one finally managed to find the time to take the camera for a walk during an interval of calm atmospherics and comfortable temperatures – a rare confluence for a humble narrator this summer. I had no destination in mind, and just followed my feet where they led me to, which ended up being the Kosciuszko Bridge reconstruction project on the border of LIC’s Blissville section and the far western section of Maspeth.

I set up the tripod and got busy. Of special interest to me was that ramp you see slouching roughly downwards from the Kosciuszko Bridge, which is going to carry the pedestrian and bicycle lane. I literally cannot wait for this to open, which I’m told won’t be too long at this point.

– photo by Mitch Waxman

Documenting this project has been a long standing project of mine – this 2012 post tells you everything you could want to know about Robert Moses, Fiorella LaGuardia, and the origins of the 1939 model Kosciuszcko Bridge.

Just before construction started, I swept through both the Brooklyn and Queens sides of Newtown Creek in the area I call “DUKBO” – Down Under the Kosciuszcko Bridge Onramp. Here’s a 2014 post, and another, showing what things used to look like on the Brooklyn side, and one dating back to 2010, and from 2012 discussing the Queens side – this. Construction started, and this 2014 post offers a look at things.

There’s shots from the water of Newtown Creek, in this June 2015 post, and in this September 2015 post, which shows the bridge support towers rising. Additionally, this post from March of 2016 detailed the action on the Queens side. Most recently, here’s one from May of 2016, and one from June of the same year. Here’s one from August of 2016the December 2016 one, one from March of 2017 which discusses the demolition of the 1939 bridge.

Here’s a post showing what I saw during a pre opening walk through in early April of 2017, and the fanfare surrounding the opening of half of the new bridge in April of 2017, a walk through of the Brooklyn side job site in June of 2017. Here’ssome night shots from early July of 2017. A series of posts focused in on the removal of the central truss of the 1939 bridge from the summer of 2017 – a timelapse, some stills, and the barging out of the truss.

More recently, in late September of 2017, a final series of shots of the old bridge were captured in this post. Acquisition of a souvenir chunk of steel from the 1939 bridge was described in this post, and a video of the “energetic felling” of the approaches on October 1st was offered in this one. Still shots and views of the aftermath from the waters of Newtown Creek from later in the day on Oct. 1 are found in this posting, and the aftermath of the demolition as seen from Calvary Cemetery in LIC’s Blissville section in this post from October 5th. This post from December of 2017 closed out an event filled year in DUKBO, and a visit to the site at night is described in this March of 2018 post. Another progress report was offered in June of 2018. A nocturnal visit occurred in December of 2018, a short post from January of 2019, and also one from February of 2019.

– photo by Mitch Waxman

As is my habit with documenting the project, there are certain spots which I’ve returned to again and again during the process. This one is from the spot where Review Avenue bends around First Calvary Cemetery at the former LIRR Penny Bridge station. All the rain we’ve had this year has resulted in a bumper crop of everything that grows around the Newtown Creek, as you can see.

Who can guess what weird chemistries there might be, circulating through the capillaries of these feral cultivars?


“follow” me on Twitter- @newtownpentacle


Upcoming Tours and Events


Thursday, August 8, 7 p.m. – 9:00 p.m. 

“Infrastructure Creek” Walking Tour w NYC H2O

If you want infrastructure, then meet NCA historian Mitch Waxman at the corner of Greenpoint Avenue and Kingsland Avenue in Brooklyn, and in just one a half miles he’ll show you the largest and newest of NYC’s 14 sewer plants, six bridges, a Superfund site, three rail yards with trains moving at street grade (which we will probably encounter at a crossing), a highway that carries 32 million vehicle trips a year 106 feet over water. The highway feeds into the Queens Midtown Tunnel, and we’ll end it all at the LIC ferry landing where folks are welcome to grab a drink and enjoy watching the sunset at the East River, as it lowers behind the midtown Manhattan skyline.

Click here for ticketing and more information.

Saturday, August 10, 10 a.m. 12.00 p.m.

Exploring the East River, From General Slocum Disaster to Abandoned Islands – with NY Adventure Club.

June 15th is one of those days in NYC history. In 1904, more than a thousand people boarded a boat in lower Manhattan, heading for a church picnic on Long Island — only 321 of them would return. This is the story of the General Slocum disaster, and how New York Harbor, the ferry industry, and a community were forever altered.

Join New York Adventure Club for a two-part aquatic adventure as we explore the General Slocum disaster, and historic sights and stories along the East River, all by NYC Ferry.

Tickets and more details
 here.


Buy a book!

In the Shadows at Newtown Creek,” an 88 page softcover 8.5×11 magazine format photo book by Mitch Waxman, is now on sale at blurb.com for $30.

Written by Mitch Waxman

August 7, 2019 at 11:00 am

moss grown

leave a comment »

When you hear the sound of three dogs barking…

– photo by Mitch Waxman

A single night shot today, gathered at the Kosciuszcko Bridge job site a few months back. Two walking tours this week, accomplished with a broken toe attained on the first, so the second was a bit of limping tour but I didn’t let the group know about my situation until the very end up on the Pulaski Bridge. Pain and I are old friends, so we know how to coexist with one another.

Looking forward to a nice summer weekend, me, and I’ll be back Monday at this – your Newtown Pentacle – with a heartier meal for your hungry eyes.


“follow” me on Twitter- @newtownpentacle


Buy a book!

In the Shadows at Newtown Creek,” an 88 page softcover 8.5×11 magazine format photo book by Mitch Waxman, is now on sale at blurb.com for $30.

Written by Mitch Waxman

July 26, 2019 at 11:00 am

hoarsely explained

with 3 comments

Checking in on the Kosciuszko Bridge project.

– photo by Mitch Waxman

Recent endeavor has found me wandering around the fencelines of the Kosciuszko Bridge project site again, and causing their security guys all sorts of worry. As always and as a rule, one does not trespass, preferring instead the peripheries.

The second phase of the construction project began shortly after clearing the rubble left behind by the “energetic felling” of the 1939 era Kosciuszko Bridge, and this is the first post of 2019 that delves deeply into the subject.

– photo by Mitch Waxman

The overpasses carrying the Brooklyn Queens Expressway over the streets of Maspeth are nearing completion, and the crews from NYS DOT’s contractor – Granite – seem to be heavily involved with installation of various sorts of pipe. Some of these pipes will presumptively carry water down and away from the roadway, while others will be conduits for electrical cabling, or at least that’s what it looks like to this layman’s eyes.

There’s still all sorts of disruption to the local street traffic occurring here on the border between LIC’s Blissville and Industrial Maspeth. That’s the intersection of Laurel Hill Blvd. and 54th avenue, for the morbidly curious amongst you.

– photo by Mitch Waxman

Documenting this project has been a long standing project of mine – this 2012 post tells you everything you could want to know about Robert Moses, Fiorella LaGuardia, and the origins of the 1939 model Kosciuszcko Bridge. Just before construction started, I swept through both the Brooklyn and Queens sides of Newtown Creek in the area I call “DUKBO” – Down Under the Kosciuszcko Bridge Onramp. Here’s a 2014 post, and another, showing what things used to look like on the Brooklyn side, and one dating back to 2010, and from 2012 discussing the Queens side – this. Construction started, and this 2014 post offers a look at things. There’s shots from the water of Newtown Creek, in this June 2015 post, and in this September 2015 post, which shows the bridge support towers rising. Additionally, this post from March of 2016 detailed the action on the Queens side. Most recently, here’s one from May of 2016, and one from June of the same year. Here’s one from August of 2016the December 2016 one, one from March of 2017 which discusses the demolition of the 1939 bridge.

Here’s a post showing what I saw during a pre opening walk through in early April of 2017, and the fanfare surrounding the opening of half of the new bridge in April of 2017, a walk through of the Brooklyn side job site in June of 2017. Here’s some night shots from early July of 2017. A series of posts focused in on the removal of the central truss of the 1939 bridge from the summer of 2017 – a timelapse, some stills, and the barging out of the truss.

More recently, in late September of 2017, a final series of shots of the old bridge were captured in this post. Acquisition of a souvenir chunk of steel from the 1939 bridge was described in this post, and a video of the “energetic felling” of the approaches on October 1st was offered in this one. Still shots and views of the aftermath from the waters of Newtown Creek from later in the day on Oct. 1 are found in this posting, and the aftermath of the demolition as seen from Calvary Cemetery in LIC’s Blissville section in this post from October 5th. This post from December of 2017 closed out an event filled year in DUKBO, and a visit to the site at night is described in this March of 2018 post. Another progress report was offered in June of 2018. A nocturnal visit occurred in December of 2018, and here’s a short post from January of 2019.

– photo by Mitch Waxman

Over on 43rd street, the first phase of the project which has been carrying traffic since April of 2017 is visible, with the two new concrete towers of the second phase also in sight. The first phase towers (which are in Brooklyn) are the ones that are garishly lit with cartoonish LED lighting, and the unlit ones are the second phase which are anchored into Queens.

– photo by Mitch Waxman

43rd street remains a barren industrial path, populated by heavy trucking, warehousing, welding supply, and crane companies. Set into a severe incline, 43rd street crosses Maspeth’s 56th road (which is called Review Avenue on the LIC side of the Bridge project) and continues southward towards the former premises of the Phelps Dodge company towards Newtown Creek. There’s an “at grade” rail crossing at its end, and a street called 57th avenue which is occasionally referred to as “Galasso Place.”

There’s a huge FedEx shipping hub down there, and the Restaurant Depot company, both of which sit on former Phelps Dodge properties.

– photo by Mitch Waxman

A main thoroughfare for industrial traffic, 56th road is one of those fairly terrifying street crossings you find around Newtown Creek which was definitely designed with little thought to pedestrians. As is my habit in areas like this, and particularly at night, a high visibility “safety vest” is pulled over the shoulders of my filthy black raincoat.

Given the amount of night shooting I’ve been doing over the last year, that vest has become a standard part of my camera bag kit.

– photo by Mitch Waxman

Looking through the fences at the heart of the project, southwards towards Brooklyn, from Review Avenue/56th road.

Intentionally, I went down to the site on a Sunday night when no work was going on so as to not get in the way. While you were watching the Super Bowl, I was shooting this.

– photo by Mitch Waxman

From the waterfront of Newtown Creek, looking westwards towards Manhattan, whose skyline you can just see peeking out behind Blissville’s Calvary Cemetery. The Brooklyn side is on the left, is nearby the tail or northern end of Meeker Avenue. I call both areas “DUKBO” or Down Under the Kosciuszcko Bridge Onramp.

– photo by Mitch Waxman

Looking eastwards from Review Avenue in LIC’s Blissville section, along the Lower Montauk tracks of the Long Island Rail Road. According to people in the know whom I’ve asked, the new bridge is due to open in either Q2 or early Q3 of this year. It all depends on the severity of winter weather.


“follow” me on Twitter- @newtownpentacle

Written by Mitch Waxman

February 6, 2019 at 12:15 pm

led by

with 4 comments

I’m not wearing a costume.

– photo by Mitch Waxman

One has been taking care of all the existential stuff since the New Year started, as my personal world doesn’t start turning again until next week. Laundering, prescription filling, walking the camera about, drinking plenty of water – those are some of the items which have been at the top of my list. Last night I stopped by a community board meeting in Sunnyside for a few minutes, which was focused on responding to the Amazon news. Luckily I was there when an older gentleman made his public statement (having nothing to do with the subject of the day) and declared that he was older than the Triborough Bridge and he wanted all of Queens’ bridges to revert back to their original names. He asked if the Battery Tunnel takes you to Hugh or Carey. I loved him, instantly.

Pictured above is the scene in DUKBO, looking southwards towards Brooklyn.

– photo by Mitch Waxman

They seem to be hard at work on the K-Bridge project, which is scheduled to open its second span sometime in the second or third quarter of the year. That’s the BQE they’re putting together in the shot above, specifically the new southbound lanes which will also host the pedestrian and bicycle path which I’ve been endlessly anticipating. I am likely going to spend an entire week camped out up there when it’s opened, with a passel of lenses both long and wide, getting every shot of Newtown Creek from high above that I possibly can.

I consider it lucky that the bridge replacement project has occurred on my watch, and that I’ve been documenting every stage of it from every possible angle for years now. I’ve even got a chunk of steel from the old bridge.

– photo by Mitch Waxman

The challenging part of visiting this spot, and the pathway which all those bike and pedestrian people have set out for them, is the terrifying “last mile” section which is owned by the City. This is the approach that spits you out onto 43rd street after walking on a sidewalk adjoining the onramp for the BQE, with nothing separating you from traffic other than a three inch curb. That’s Sunnyside’s 43rd street, incidentally, at Borden Avenue. The neighborhood has to get this sorted out before the bicycle fanatics notice it, I think.

Me? I’ve got to go pick up the laundry.


“follow” me on Twitter- @newtownpentacle

Written by Mitch Waxman

January 4, 2019 at 1:00 pm